Training Course Locations Inside Saudi Arabia
Jeddah
Dammam
Abha
Riyadh
Al Baha
Al Khobar
Alula
Taif
Makkah Al-Mukarramah
Al-Madinah Al-Munawwarah
Training Course Locations Outside Saudi Arabia
DUBAI (UAE)
Kuala Lumpur (Malaysia)
Amman (Jordan)
Jakarta (Indonesia)
Sharm ElShaikh (Egypt)
Amsterdam (Netherlands)
Casablanca (Morocco)
Paris (France)
Istanbul (Turkey)
Singapore (Singapore)
Manama (Bahrain)
Washington (US)
Beirut (Lebanon)
Barcelona (Spain)
Kuwait (Kuwait)
Budapest (Hungary)
Athens (Greece)
Copenhagen (Denmark)
Berlin (Germany)
Brussels (Belgium)
Bucharest (Romania)
Zurich (Switzerland)
Hamburg (Germany)
Marrakesh (Morocco)
Beijing (China)
Doha (Qatar)
Bangkok (Thailand)
Muscat (Oman)
Toronto (Canada)
Cyprus (Larnaka)
Cairo (Egypt)
Madrid (Spain)
London (UK)
Stockholm (Sweden)
Geneva (Switzerland)
Vienna (Austria)
Munich (Germany)
Prague (Czech Republic)
Rome (Italy)
Hong Kong
Dublin (Ireland)
Auckland (New Zealand)
Trabzon (Turkey)
Florence (Italy)
Tunisia
Marbella (Spain)
New York (US)
Tbilisi (Georgia)
Frankfurt (Germany)
Malaga (Spain)
Yerevan (Armenia)
Baku (Azerbaijan)
Zagreb (Croatia)
Hurghada (Egypt)
Warsaw (Poland)
Milan (Italy)
Chicago (US)
Los Angeles (US)
Tokyo (Japan)
Seoul (South Korea)
INTRODUCTION
The management of technical projects is becoming a challenge to professional engineers in an increasingly competitive marketplace in which effective project planning and control approaches in compliance with clients’ contractual requirements. Successful project managers demand that their projects meet technical objectives and be completed on schedule and within budget. To ensure success, an effective project control system must be designed, developed and implemented to provide management with timely and accurate information on deviations of cost and time parameters from the target objectives established during the planning cycle of the project.
Earned Value Management (EVM) is a project planning and control approach which provides cost and schedule performance measurements. It compares actual accomplishment of scheduled work and associated cost against an integrated schedule and budget plan. Its benefits include visibility into the true progress of the project work against the budget, projections of anticipated project schedule and cost trends and the ability to take timely corrective actions for undesired variances. EVM is considered to be one of the most powerful and productive concepts utilized in managing today’s complex projects in private, commercial or government environments.
PROGRAMME OBJECTIVES
PROGRAMME SUMMARY
This training session is designed for those who want to learn the principles of EVM used for project performance measurement, a proven method to evaluate project work progress in order to identify early potential schedule slippage and areas of budget overruns. It provides practical coverage of an accurate and realistic reflection of the integrated scope, cost and schedule parameters of a project to assist both contractors and client management in the decision-making process.
| Course Title | Duration | Class Room/ Online | Fees |
|---|---|---|---|
| Earned Value Management for Project Performance Measurement | 2026-10-18 2026-10-22 |
Class Room
Riyadh
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2026-10-25 2026-10-29 |
Class Room
Al-Baha
|
13950 SR |
| Earned Value Management for Project Performance Measurement | 2026-10-25 2026-10-29 |
Class Room
Al-Khobar
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2026-11-08 2026-11-12 |
Class Room
Jeddah
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2026-11-08 2026-11-12 |
Class Room
Abha
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2026-12-13 2026-12-17 |
Class Room
Riyadh
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2026-12-20 2026-12-24 |
Class Room
Alula
|
13950 SR |
| Earned Value Management for Project Performance Measurement | 2026-12-27 2026-12-31 |
Class Room
Alula
|
13950 SR |
| Course Title | Duration | Class Room/ Online | Fees |
|---|---|---|---|
| Earned Value Management for Project Performance Measurement | 2027-02-21 2027-02-25 |
Class Room
Abha
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-02-28 2027-03-04 |
Class Room
Jeddah
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-03-07 2027-03-11 |
Class Room
Jeddah
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-03-07 2027-03-11 |
Class Room
Al-Baha
|
13950 SR |
| Earned Value Management for Project Performance Measurement | 2027-03-14 2027-03-18 |
Class Room
Al-Baha
|
13950 SR |
| Earned Value Management for Project Performance Measurement | 2027-03-14 2027-03-18 |
Class Room
Jeddah
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-04-04 2027-04-08 |
Class Room
Alula
|
13950 SR |
| Earned Value Management for Project Performance Measurement | 2027-04-04 2027-04-08 |
Class Room
Dammam
|
12950 SR |
| Course Title | Duration | Class Room/ Online | Fees |
|---|---|---|---|
| Earned Value Management for Project Performance Measurement | 2027-04-11 2027-04-15 |
Class Room
Dammam
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-04-18 2027-04-22 |
Class Room
Abha
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-05-09 2027-05-13 |
Class Room
Al-Khobar
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-05-23 2027-05-27 |
Class Room
Al-Baha
|
13950 SR |
| Earned Value Management for Project Performance Measurement | 2027-05-23 2027-05-27 |
Class Room
Dammam
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-05-23 2027-05-27 |
Class Room
Al-Khobar
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-06-13 2027-06-17 |
Class Room
Jeddah
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-06-20 2027-06-24 |
Class Room
Abha
|
12950 SR |
| Course Title | Duration | Class Room/ Online | Fees |
|---|---|---|---|
| Earned Value Management for Project Performance Measurement | 2027-07-04 2027-07-08 |
Class Room
Al-Khobar
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-07-04 2027-07-08 |
Class Room
Makkah-Al-Mukarramah
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-07-04 2027-07-08 |
Class Room
Riyadh
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-07-11 2027-07-15 |
Class Room
Dammam
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-07-11 2027-07-15 |
Class Room
Abha
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-07-11 2027-07-15 |
Class Room
Alula
|
13950 SR |
| Earned Value Management for Project Performance Measurement | 2027-07-18 2027-07-22 |
Class Room
Taif
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-07-18 2027-07-22 |
Class Room
Riyadh
|
12950 SR |
| Course Title | Duration | Class Room/ Online | Fees |
|---|---|---|---|
| Earned Value Management for Project Performance Measurement | 2027-08-01 2027-08-05 |
Class Room
Alula
|
13950 SR |
| Earned Value Management for Project Performance Measurement | 2027-08-01 2027-08-05 |
Class Room
Riyadh
|
12950 SR |
| Earned Value Management for Project Performance Measurement | 2027-08-08 2027-08-12 |
Class Room
Al-Khobar
|
12950 SR |
Earned Value Management for Project Performance Measurement
Riyadh
Earned Value Management for Project Performance Measurement
Al-Baha
Earned Value Management for Project Performance Measurement
Al-Khobar
Earned Value Management for Project Performance Measurement
Jeddah
Earned Value Management for Project Performance Measurement
Abha
Earned Value Management for Project Performance Measurement
Riyadh
Earned Value Management for Project Performance Measurement
Alula
Earned Value Management for Project Performance Measurement
Alula
Earned Value Management for Project Performance Measurement
Abha
Earned Value Management for Project Performance Measurement
Jeddah
Earned Value Management for Project Performance Measurement
Jeddah
Earned Value Management for Project Performance Measurement
Al-Baha
Earned Value Management for Project Performance Measurement
Al-Baha
Earned Value Management for Project Performance Measurement
Jeddah
Earned Value Management for Project Performance Measurement
Alula
Earned Value Management for Project Performance Measurement
Dammam
Earned Value Management for Project Performance Measurement
Dammam
Earned Value Management for Project Performance Measurement
Abha
Earned Value Management for Project Performance Measurement
Al-Khobar
Earned Value Management for Project Performance Measurement
Al-Baha
Earned Value Management for Project Performance Measurement
Dammam
Earned Value Management for Project Performance Measurement
Al-Khobar
Earned Value Management for Project Performance Measurement
Jeddah
Earned Value Management for Project Performance Measurement
Abha
Earned Value Management for Project Performance Measurement
Al-Khobar
Earned Value Management for Project Performance Measurement
Makkah-Al-Mukarramah
Earned Value Management for Project Performance Measurement
Riyadh
Earned Value Management for Project Performance Measurement
Dammam
Earned Value Management for Project Performance Measurement
Abha
Earned Value Management for Project Performance Measurement
Alula
Earned Value Management for Project Performance Measurement
Taif
Earned Value Management for Project Performance Measurement
Riyadh
Earned Value Management for Project Performance Measurement
Alula
Earned Value Management for Project Performance Measurement
Riyadh
Earned Value Management for Project Performance Measurement
Al-Khobar
Scandinavian Academy for Training Center
Under the supervision of the Technical and Vocational Training Corporation
C.R / 1010962556
Vat No : 311960051200003